Surpac · Mine Planning

Open Pit & Waste Dump Design in Surpac

Turn an optimised shell into a practical pit with ramps, berms and a waste dump.

5.05 lessons
S
sasujosephkwaku@gmail.com
Production Engineer
About this course

In this course you design a practical open pit in Surpac. You start with a simple pit built from string tools, then prepare real design data: ore outlines, Whittle shell outlines from the block model and slope values. Using the pit design tools you define starting strings, slope methods and ramps, expand bench by bench with berms, edit and restart designs, and build switchbacks. Finally you create a DTM of the design, intersect it with topography, report grade and tonnes inside the pit, and design a waste dump and calculate its volume.

What you'll learn
  • Design a simple pit with string tools and the minedesign profile
  • Prepare ore outlines, Whittle outlines and slope values for design
  • Use pit design tools for slopes, ramps, bench expansion and berms
  • Design switchbacks and multiple benches and intersect the pit with topography
  • Report grade and tonnes inside the design and design a waste dump with its volume
  • Curriculum
    1 modules · 5 lessons ·

    • Pit Design Fundamentals: A Simple Pitlive2h 0m
    • Preparing Design Datalive2h 0m
    • Core Pit Design Toolslive2h 0m
    • Advanced Design & Surface Integrationlive2h 0m
    • Grade & Tonnage and Waste Dump Designlive2h 0m
    Reviews

    Sign in to leave a review.

    No reviews yet. Be the first to leave one.